Home









 

   ÇÑ ¹Ì »ê ¾÷ 

ÀüÈ­ :  02 - 3411 - 0173

 ÆÑ½º :  02 - 3411 - 0178 

sales@gohanmi.com



°øÁ¤ Á¦¾î¸ðÀǽÇÇè¼ÒÇÁÆ®¿þ¾î 

Basic Process Station

Virtual Reality Control Rooms (VRCRs)

¿µ±¹ TSC(Technical Simulation Consultants Limited) »çÀÇ ¸ðÀǽÃÇè ¼ÒÆ®Æ®¿þ¾î´Â

±âº»ÀûÀÎ °øÀ屸¼ºÀÎ À¯°ø¾Ð ½Ã½ºÅÛ°ú °øÁ¤ÀÇ ÇÙ½ÉÁ¦¾î ±â¼ú¿¡ ´ëÇÏ¿©, ÀÛ¾÷ÀÚµéÀÌ

¸ðÀǽÇÇè ÈÆ·ÃÀ» ÇÏ¿©,

°øÁ¤¿¡¼­ »ç¿ëÁßÀÎ ±â¼úÀÇ ±âº» °³³ä È®¸³ ¹× ½ÇÁ¦ »ý»ê °úÁ¤°ú °øÁ¤ Shut Down~Àç°¡µ¿¿¡¼­ ¹ß»ýµÇ´Â ÀÛ¾÷ÀÚÀÇ °øÁ¤Á¦¾î ¹Ì¼÷À¸·Î ¹ß»ýµÇ´Â ¾öû³­ ºñ¿ë ¹ß»ý, ±ä±Þ»ç°í¿¡ ´ëºñÇÑ ÀáÀçµÈ ´ëÇü ÀçÇØ¿¡ ´ëÇÑ ¸ðÀÇ ½ÇÇèµî ´Ù¾çÇÑ ½ÇÇèÀ» ÇÏ¿©,

Á¤À¯, È­ÇÐ, Á¦Ã¶, Á¦Áö µîÀÇ °øÀå¿¡¼­ »ý»ê¼º Çâ»óÀ» À§ÇÑ ¼ÒÇÁÆ®¿þ¾î ¹×

¸ðÀǽÇÇè CONTROL ROOMÀ» Á¦°øÇÑ´Ù.

¾Æ·¡ ¸ðµ¨100°ú 200 ½Ã¸®Áî´Â ´Ù¼öÀÇ Á¦¾î ¿ø¸®¸¦ ½ÇÇèÇϰí, 300°ú 400 ½Ã¸®Áî´Â ÇϺΠÁ¶Á÷ °øÁ¤ÀÇ À¯¿ëÇÑ ¼ö¾÷À» Á¦°øÇÑ´Ù. 500 ½Ã¸®Áî´Â Áøº¸µÈ ÈÆ·Ã°ú Æò°¡¸¦ À§ÇÑ ¿ÏÀüÇÑ °øÀå ½Ã½ºÅÛÀ» Æ÷ÇÔÇÑ´Ù. 

±×¸®°í, DCS ROOM°ú °°Àº ¸ðÀÇ ÈÆ·Ã ½ÃÇè¿ë °øÁ¤Á¦¾î½ÇÀ» °ø±ÞÇÏ¿©, °íºÎ°¡°¡Ä¡ÀÇ °øÁ¤¿¡¼­

¿¹ÃøÇÏÁö ¸øÇÑ Àç³­ ´ëºñ ¹× Àú»ý»ê¼º ¿ä¼ÒµéÀ» °³¼± ½Ãų ¼ö ÀÖÀ¸¸ç,  »óǰÀÇ Á¾·ù´Â ¾Æ·¡¿Í

°°½À´Ï´Ù.

 

1.°øÀ屸¼º À¯°ø¾Ð ½Ã½ºÅÛÀÇ ±âº» °³·Ð ¹× ÇÙ½É  Á¦¾î±â¼ú ½ÃÇè.

 

2.DCSÁ¦¾î·ë°ú µ¿ÀÏÇÑ È¯°æ °ø±ÞÇÏ¿©, »ý»ê¶óÀΠÀÇ  ¸ðÀÇ ½ÇÇè ¹× Àç³­¿¡ ´ëÇÑ ¿¹¹æ ÈÆ·Ã.

 

3.»ý»ê¶óÀÎ ÃÖÀûÈ­ ¼³°è °ËÁõ ¹× »ý»ê¶óÀÎ È¿À²ÀÇ  ±Ø´ëÈ­.

 

4.´ëÇüÀ¯Á¶¼±¹Ú ȤÀº LNG¼±¹ÚÀÇ ÇÏ¿ªÀå¿¡¼­ ºÎÅÍ Á¤À¯,È­ÇÐ,LNGµîÀÇ »ý»ê°øÀåÀÇ ÀϰýÀû

   Process  È¿À²È­ ¸ðÀÇ ½ÇÇè ¼ÒÇÁÆ®¿þ¾î°¡ »õ·Î ¿µ±¹¿¡¼­ Ãâ½ÃµÇ¾î »ç¿ëÁßÀÔ´Ï´Ù.

 

                                                ¾Æ·¡ ¼ÒÇÁÆ®¿þ¾îÀÇ ÀڷḦ º¸½Ã¸é ±×·¡ÇÈ ±×¸²À»

                                                ÀμâÃâ·Â¿ëÀ¸·Î º¯È¯½ÃÄÑ, »ö»ó°ú ¸ð¾çÀÌ ÁÁÁö ¾Ê½À

                                                ´Ï´Ù. ½ÇÁ¦ »óǰÀº ÈξÀ ¼¼·ÃµÈ »ö»ó°ú ¸ð¾çÀÔ´Ï´Ù.

BASIC PROCESS PLANT TRAINING (À¯°ø¾Ð Á¦¾î ±âº» °³·Ð)

Series 100 Basic Control Principles         

-SIM 100 Valve Characteristics 
-SIM 101 Basic PID Level Control
-SIM 102 Pressure and Level Control
-SIM 103 Flow and Pressure and Level Control
-SIM 104 Flow and Pressure Control    
-SIM 105 Flow and Level Control  
-SIM 106 Temperature Control across Heat Exchanger
-SIM 107 Temperature Control across Condenser  

Series 200 Complex Control Type                                          

-SIM 200: Direct and Cascade Control
-SIM 201: Split Range Level Control
-SIM 202: Three Phase Separation with Weir
-SIM 203: Direct Temperature Control 
-SIM 204: Cascade Temperature Control    
-SIM 205: Feedforward Temperature Control  
-SIM 206: Level and Temperature Control
-SIM 207: Condenser with a Reflux Drum
-SIM 208: Oil Export System
-SIM 209: Three Phase Separator with Boot
-SIM 210: Basic Pump Operations                                        

Series 300 Basic Plant Items      

-SIM 300: Centrifugal Compressor
-SIM 301: Speedtronic Control Panel
-SIM 302: C3/C4 Binary Column
-SIM 303: Gas/Oil/Water Separation Train
-SIM 304: TEG Gas Dehydration
-SIM 305: Volumetric Well Control
-SIM 306: Amine Tower
-SIM 307: Basic Refrigeration Circuit
-SIM 308: Variable Speed Centrifugal
-SIM 309: Reciprocating Compressor
-SIM 310: Basic Turbine

Series 400 Basic Plant Systems                                               

-SIM 400: De Ethaniser Column
-SIM 401: De-propaniser Column
-SIM 402: Separation Train
-SIM 403: Wellheads and Risers
-SIM 404: Advanced Fixed Speed Compressor
-SIM 405: Advanced Variable Speed Compressor
-SIM 406: Advanced Reciprocating Compressor
-SIM 407: Advanced 2 Stage Compressor
-SIM 408: Compressor with Pipeline
-SIM 409: Two Stage Compressor with ESD
-SIM 410: Turbo-Expander
-SIM 411: Refrigeration System

Series 500 Fulll Plant System

 -Model 500 : Benfield Process

-Model 501 : Benzene Concentration Unit

-Model 507 : C2-C3-C4 Fractionation

-Model 508 : TEG Gas Dehydration System

-Model 509 : Demineralisation Plant

-Model 510 : Boiler Plant

Advanced Control Room Operator Training(°øÀå´ÜÀ§ ¹× Ç÷£Æ® Àüü ½ÃÇè)

-  Site Specific Simulation Models

-  Advanced Generic Simulations                                                   

-  Virtual Reality Control Rooms (VRCRs) --ÄÁÅ×À̳ʿ¡ DCS °¡»ó°ø°£Á¦°ø       

 Plant Design Verification & Optimisation( °øÁ¤ ÃÖÀûÈ­ ¼³°è)

ÇöÁ¸ÇÏ´Â Ç÷£Æ® ȤÀº ¼³°è ¿¹Á¤ÀÎ PLANT¿¡ ´ëÇÏ¿© ¸ðÀÇ ½ÇÇè ¼ÒÇÁÆ®¿þ¾î¸¦ ÅëÇÏ¿©, ¾Æ·¡¿Í °°Àº °á°ú¸¦ ¾òÀ» ¼ö ÀÖ´Ù.

1.°øÁ¤ ÃÖÀûÈ­¿¡ ´ëÇÑ °ËÁõ

2.°øÁ¤¿¡ ´ëÇÑ ÀÛ¾÷ÀÚÀÇ Ä£¼÷µµ Çâ»ó.

 

ÀÌ·¯ÇÑ ¼­ºñ½º´Â °øÁ¤¿¡¼­ ¹ß»ýµÇ´Â ¾Æ·¡ °øÁ¤ ¿ä¼ÒµéÀ» ¸ðÀÇ ½ÇÇè ÇÔÀ¸·Î½á,¿µ±¹ÀÇ À¯¸í SHELL, Phillip Petroleum, Esso Pertoleum, Exxon, BP, CIBAµîÀÇ  Á¤À¯, È­°ø°øÀå »ý»ê¼º Çâ»ó¿¡ ȹ±âÀûÀÌ °á°ú¸¦ ¾ò°Ô µÇ¾úÀ¸¸ç, ÃÖ±Ù¿¡´Â ¿µ±¹³» °¡½º¹è°ü °ø»ç¿Í °¡½ºÀÌ¼Û ½Ã½ºÅÛ °³¼± ÀÛ¾÷µµ ÈǸ¢È÷ ¼öÇàÇÏ¿´´Ù.

 1,Start-Up ÃÖÀûÈ­

 2.°øÁ¤ º¯°æ

 3.¼³ºñÀÇ °íÀå ¹× Á¤Àü

 4.Á¦¾î ¶óÀÎÀÇ ¼¾¼­¿Í Alarm Fault ¿À·ù °ü¸®

 5.Àç³­ ¹× À§Çè ¹ß»ý 

 Çѹ̻ê¾÷ 

ÀüÈ­ :  02 - 3463 - 6757    ÆÑ½º :  02 - 3463 - 6759 

sales@gohanmi.com

2001-2005 Hanmi Industries Ltd. All rights reserved
sales@gohanmi.com